Quality Control

With pipe fittings, one wrong letter in a material grade means the wrong goods. That is why every order goes through our four-step inspection process before it ships.

Our QC Process

1

Raw Material Verification

Original mill certificates checked for every heat number. Spectrometer analysis (PMI) available to verify material grade before production.

2

In-Process Inspection

Wall thickness monitoring during forming, dimension checks against ASME B16.9 / B16.5 tolerances, visual inspection of bevels and surfaces.

3

Final Inspection

100% dimensional check on finished goods: OD, wall thickness, center-to-end, angle. Hardness test and NDT (UT/MT) on request.

4

Loading Supervision

We photograph and video the inspection and container loading, and send everything to you before the vessel departs.

✓

Certificates

Mill Test Certificate per EN 10204 3.1 with every batch. EN 10204 3.2 (third-party witnessed) available for critical projects.

✓

Third-Party Inspection

SGS, BV or your appointed inspector are welcome at the factory at any stage — just let us know when you place the order.

Testing Capabilities

DimensionalCalipers, ultrasonic wall thickness gauge, templates per ASME B16.9 / B16.5
MaterialSpectrometer (PMI), chemical analysis via mill certificates, hardness testing
Non-DestructiveUltrasonic testing (UT), magnetic particle testing (MT), dye penetrant (PT) on request
DocumentationMTC EN 10204 3.1 / 3.2, inspection reports, photo & video records per order

Need a Quotation?

Send us your specifications — product, size, schedule, material and quantity. We reply within 24 hours with factory-direct prices.